July Achievements and August goals

July goals:

1. AHQ: One quilt … not quite finished. All the walking foot quilting has been done, but I had three strips 6″ wide so I decided to have yet another attempt at ruler work, using a crescent shape from the Westalee Janome sampler set I bought in January. I did manage to get the quilt to move this time (by using the medium setting and ramping the pressor foot height up to maximum) but even then the result was not good:

Ruler Work attempt
Ruler Work attempt

So this will be unpicked tomorrow and I’ll draw more straight lines that I can do with the walking foot. I should have it in the post by Friday Monday. Note: I honestly thought it was Tuesday today, not Thursday. Where did the week go?

The more attempts I make, the more I believe that the upgrade for the 9400 was not worth it. It’s a lot harder to move a quilt through a domestic sewing machine than it is to move a longarm machine over a quilt, and even with all the sticky patches I can’t stop the foot from shifting the ruler out of position. Honestly, I think I’d be better off practising my FMQ.

2. Personal: eh, not done (I’m not sure I’ll continue listing this goal as it’s almost never done).

3. FAL: still working on precise measurements for the Blue Christmas panel quit — I want to have as few seams as possible so I’m trying to work on placing the small panels in pairs rather than individually.

Additional Work:
I didn’t actually work on anything else this month but I did get two thank you letters this month from recipients of my quilts. One was physical, a lovely hand-made card:

Thank You card
Thank You card

The other was by email and included a picture of the quilt and also the laundry bag — I’m so grateful for that as I forgot to take a picture of the laundry bag myself before posting and it was a design I was particularly pleased with:

Camo Kitty Laundry Bag
Camo Kitty Laundry Bag

August goals:
1. AHQ: 4 generic laundry bags
2. Personal: Not setting one this month.
3. FAL: Complete the Blue Christmas top and start on the quilting